After this module you will be able to take a list of candidate projects from a client, test each one against the definition identified in Module 1 using a written template, draw the boundary of the eligible work in time, scope and people, and record a decision not to claim in a form that protects both the client and your practice.
What this module covers
- The order of analysis: exclusions, then the uncertainty, then the systematic work, then the boundary.
- An analysis template that indexes the evidence for each element of the definition.
- A boundary-drawing method for time, scope and people.
- Documenting the decision not to claim.
The order of analysis
Eligibility analysis fails most often because it starts with the most interesting question, whether there was a technical unknown. The first question is whether the activity is excluded: five schemes carry a statutory list of excluded activities and Ireland's are in regulations, and an activity within one of them never reaches the uncertainty test.
- Exclusions. Compare the activity with the list for the country.
- Baseline. State what was known in the field when the work began and what the client's own people knew. Uncertainty exists only relative to a baseline, and every scheme judges it at the outset.
- Uncertainty. State what could not be known or determined from that baseline, in the words of the definition for the country.
- Systematic work. Identify the hypotheses, the alternatives considered, the experiments or analysis and the conclusions.
- Boundary and decision. Fix the start, the end and the scope, then record whether the project or activity is in, out or in part, and why.
The analysis template
Complete the template once per project in a project based scheme and once per experimental activity in an activity based scheme. Every row asks for evidence by document name and date.
| Element | Question to answer | What to record | Evidence to cite |
|---|---|---|---|
| Identification | What is the project or activity, in the name the client's records use? | Name, owner, field, dates | Project register, ticket board, engineering plan |
| Exclusions | Does any part fall within the exclusions for this country? | Each exclusion considered and the conclusion | The country's exclusion list; the activity description |
| Baseline | What did a competent professional know at the start, and what had the client already done? | Sources consulted, prior attempts, vendor or literature positions | Design notes, search records, supplier correspondence |
| Uncertainty | What could not be known or determined from the baseline? | One or two sentences in the words of the definition | Dated statement of the unknown made before the work |
| Systematic work | What was hypothesised, tried, measured and concluded? | Alternatives, experiments, failures, changes of direction, in date order | Test logs, experiment records, commits, lab notebooks |
| Supporting work | Which non-experimental work was needed, and does this scheme admit it? | Each item and the experimental work it supports | Plans, build records, data collection records |
| Location and risk | Where was the work performed, who bore the cost, who owns the results? | Sites, contracts, funding sources | Contracts, grant agreements, intercompany agreements |
| Boundary | When did the eligible work start and end, and which parts are out? | Start event, end event, excluded workstreams | Kickoff note, milestone or release record |
| Decision | In, out, or in part? | Decision, reason, decision maker, date | The rows above |
Drawing the boundary
Time
This is a useful working rule in every scheme: eligible work begins when work to resolve the uncertainty starts and ends when the uncertainty is resolved or work on it ceases. The United Kingdom guidelines state it explicitly. Fix both to a dated record: the design note that states the unknown, and the test result, milestone or release note that shows it answered.
Scope
Within the period, separate the workstreams that addressed the uncertainty from those that did not. In the United States this is formalised by applying the test to the whole product, process or piece of software and then to successively smaller subsets of its elements; elsewhere the same discipline is applied by listing the workstreams and marking each one. Write the excluded workstreams down; the cost analysis in Module 3 needs the list.
People
The names in the technical record should be the names whose time is claimed. A person who appears in no experiment, test or design record is claimed only where a supervisory or support role is shown and the scheme admits it.
Documenting the decision not to claim
A rejected project is evidence of a careful process, and in a review it is often the first thing that persuades the reviewer that the included projects were tested rather than assumed. For each rejected candidate the file holds a short note with five elements: the project name as the client's records use it, the candidate uncertainty considered, the reason it fails (readily deducible from existing knowledge, an excluded activity, funded or performed for another person, or outside the required location), who decided and when, and the documents relied on. The technical lead signs the note as well as the practitioner. Partial decisions are documented the same way, recording the end event and the excluded workstreams.
Illustrative example
Illustrative example. Harbour Robotics Ltd, a hypothetical company, brings three candidate projects to its advisor, each with costs of 100,000. Project A integrated a purchased vision camera with the robot controller using the vendor's documented interface; the vendor's guide answered every question, so it is documented as out with the technical lead's agreement. Project B developed a gripping algorithm for soft irregular objects; a dated kickoff note states that no published approach met the damage threshold, the test logs show four approaches tried and two abandoned, and a release note in month seven records the target met. Project B is in for seven months; the five months of productionisation after the release note are out. Project C was performed under a customer contract that paid the company regardless of outcome and gave the customer the results; the note records the contract terms and the conclusion for the country concerned. Three notes go on file, and the benefit for Project B is calculated at that country's rate on the costs inside the boundary.
Across the seven countries
| Country | Unit of analysis and test | Exclusions to check first |
|---|---|---|
| United States | The business component; all four parts of the test in section 41(d) must be met | Research after commercial production begins, adapting or duplicating an existing business component, surveys and routine data collection, and research conducted outside the United States are among the exclusions |
| United Kingdom | The project; it must seek an advance in science or technology by resolving scientific or technological uncertainty | Market research, cosmetic and aesthetic design, and commercial and financial work do not form part of R&D unless they directly contribute to resolving the uncertainty |
| Ireland | Qualifying R&D activities; the science test requires a prescribed field, an advancement sought, uncertainty a competent professional could not readily resolve, and systematic, investigative or experimental work | The Regulations exclude routine testing and analysis for quality or quantity control, cosmetic or stylistic alterations, and research in the social sciences, arts or humanities, among others |
| Canada | Systematic investigation or search by means of experiment or analysis; the guidelines ask why the work was done and how it was done | Market research or sales promotion, quality control or routine testing, style changes and routine data collection, among others |
| Australia | Each core R&D activity, with supporting R&D activities tied to it; the outcome cannot be known in advance from current knowledge | Market research, management studies or efficiency surveys, complying with statutory requirements or standards, and software for the internal administration of business functions, among others |
| New Zealand | Each core activity, with supporting activities required for and integral to it; approval comes before the claim | Schedule 21 excludes preproduction activities such as demonstration of commercial viability, tooling up and trial runs, and software for the internal administration of the business |
| Singapore | The study or project; three requirements: the objective, novelty or technical risk, and a systematic, investigative and experimental study | Quality control or routine testing, routine data collection, efficiency surveys or management studies, market research, routine modifications and cosmetic or stylistic changes |
Where to go next
- How to run a project identification workshop with your technical team
- Qualifying versus non-qualifying activities: where the line really sits
- R&D tax incentives for manufacturers: where the qualifying work hides
- The funded research exclusion in the United States
- Advisor and Practitioner Program overview
Self-check questions
Answer each question, then open it to compare.
Why does the analysis template ask for the baseline of knowledge before it asks for the uncertainty?
A commercial project ran for twelve months. The technical unknown was resolved in month seven. Where does the claim boundary fall, and what happens to the last five months?
What are the five elements of a documented decision not to claim a project?
In which order are the exclusions check and the uncertainty test applied, and why?
Two schemes test activities rather than projects. How does that change the analysis template?
Official sources
- Treasury Regulation 1.41-4, Qualified research for expenditures paid or incurred in taxable years ending on or after December 31, 2003Electronic Code of Federal Regulations
- Guidelines on the meaning of research and development for tax purposesDepartment for Science, Innovation and Technology
- Guidelines on the eligibility of work for SR&ED tax incentivesCanada Revenue Agency
- Guide to Interpretation (R&D Tax Incentive)Department of Industry, Science and Resources
- Tax and Duty Manual Part 29-02-03, Research and Development Corporation Tax CreditRevenue Commissioners
Register interest in Advisor and Practitioner Program
Tell us where you claim and we will let you know when this program opens for your country.
Educational content only, not tax advice. See the disclaimer.